EPN System Maintenance Service Program
Any Biach equipment (including fluid filter cart) which becomes contaminated and cannot be released from site will be quoted for purchase by site.
Service Program set up on annual basis with phases scheduled and coordinated with Biach Technical Field Service Department.
*Note: Completion of Phases I and II extends the EPN warranty one full year.
Phase
I: Regular Service At 9 Month Intervals (Prior to
Each Outage) |
Purpose |
This phase cycles the pump at regular intervals and storage inspection and serves as a pre-outage preparation call |
Allotted
Time |
1 Day For Service |
Scope of Work |
- Fluid sample of hydraulic fluid
- Inspect H20 gate vent filter (or install)
- Cycle the pump and inspect entire system for leakage
- Inspect electrical system
- Calibrate the system (with site I&C Dept.)
- Assure proper storage of console and pump assembly
|
|
Phase II: Overhaul Service After 2nd Outage Use
|
Purpose |
Service inspection, maintenance and adjustments |
Allotted
Time |
3 Days For Service |
Scope of Work |
- Change all filters
- Replace seals in low pressure pump and booster
- Drain reservoir and inspect interior condition
- Inspect and replace (as needed) all hydraulic connectors
- Flush all hydraulic hoses and manifold (as applicable)
- Flush and cycle reservoir fluid through special filter assembly
- Service motor
- Test operating pressure at all valves
- Cycle pump and run full pressure test for leaks
- Inspect console interior
- Replace all fuses
- Perform diagnostic inspection of electric system
- Inspect
|
Five Year and Ten Year Service
Intervals for Replacement of Major Components.
For more information contact
Gary Pavelka: GaryP@biach.com